The ambitiously worked out steel construction of the extension for the Biberach technical college is illustrated in this structure by two examples: the roof construction in the laboratory building and the gallery in the entrance hall of the lecture building. The constructions were prefabricated and zinc-coated at the factory and bolted on-site.