An extension was required to a school complex dating from the 1970s to accommodate day-care facilities. Since the existing structure was regarded as having only a limited load-bearing capacity, the new development was initially to be located in the playground area. The architects demonstrated, however, that the existing low-rise concrete structure was capable of supporting a lightweight addition on the...