The client wanted a building which would provide maximum flexibility to accommodate future changes. The resulting factory is arranged in four sections, each with its own 18 m square courtyard, in the centre of which is a 31.5 m high pylon supporting the roof by means of four sets of tension rods positioned diagonally on plan. An uninterrupted floor area...