The 14 houses, linked by smaller structures to form a gently curving row, mark the first stage of a larger development on a former airport site. The houses had to be completed within a period of nine months. An industrial precast concrete unit system was, therefore, chosen for the structure, combined with prefabricated glazed or timber-clad facade elements. The external...