The competition brief required a combination of working space for an engineering office (2,900 m2) and living space (1,950 m2) for the employees. An intelligent, economic, “low-tech” solution was sought for the buildings. The scheme was realized to construction prices of ™650/m2 for the offices and ™850/m2 for the 14 dwellings. The two uses are housed in separate structures that...