Operations Building in Frutigen

The infrastructure centre, with workshop and fire station, was constructed to facilitate operating the new, 36 km long Lötschberg tunnel, but its halls were initially used as staging area for the tunnel construction. The two buildings – similar in volume but of varying lengths – lie next to the tracks, united by a common base. The overhangs emphasize the linearity....