Temporary structure in London

This high multi-purpose 'tent' can be transported on the back of a lorry and erected in 2 days. Its elegance and lightness is achieved through tautly spanning white translucent PTFE fibre membrane across pairs of fine grp ribs which are tensioned into shape by steel props and cables. The end arches in steel project outwards slightly, their black outline tracing...