The new building of the department of works was the result of a design competition; it was completed in 1988. It is situated on the edge of the town below the castle and is composed of three buildings: garage, warehouse and administration building. The open, single-flight main staircase that follows the curve of the building was originally designed with glass treads for the transportation of even more light from the entrance hall and connecting airspaces up to the gallery.