Designed as a suspension bridge with end stays, the structure is 3.5m wide and spans a distance of roughly 73 m. In order not impede shipping, the deck can be raised to a clearance height of 10.6 m above the highest water level. The masts pivot outwards by means of hydraulic cylinders in the staying cables, and the deck, consisting of hinged precast concrete elements, is drawn upwards into an arched form. During this process, which lasts roughly 5 minutes, the walkway is increased in length by additional elements drawn out from the ends.